The temperature resistance performance test of the connecting wire can be carried out according to the "three-step method":
Equipment preparation
High and low temperature test chamber: temperature range covering -40 to+125, temperature control accuracy ± 2
• Recording device: Real time monitoring of conductor resistance and insulation resistance.
testing procedure
(1) Low temperature test: -40 ± 2, lasting for 168 hours
(2) High temperature test:+70~+125 (according to product grade), lasting for 168 hours;
(3) Temperature shock: -40 ↔+ 125, cycle 100 cycles, conversion time ≤ 30 seconds
Judgment criteria
The change in conductor resistance is ≤± 5%;
Insulation resistance ≥ 5 M Ω (conventional) or ≥ 100 M Ω (high voltage)